Waterford Road - 156th to 170th

Description

This project provides for the reconstruction of Waterford Road from 156th Street west to 170th Street as a four-lane roadway with left turn lanes including grading, storm sewer and a new bridge. The paving will be portland cement concrete with two 25-foot wide paving sections and a 15-foot grass median. The project will also include the construction of a second bridge over Walnut Creek. The bridge will be built to ultimately provide for 4-lanes of traffic and a 10-foot wide sidewalk on the north and south sides. A trail connection under the bridge will also be provided on the west side of the creek. It is anticipated that this project would be completed by the end of November 2018.

Project Status Update - 4/26/18

Construction has begun with dirt work and instillation of storm sewer.

Phase 1 - Waterford Road is closure from 156th Street to 165th Street.

It is anticipated that Phase 1 will be complete and Phase 2 will begin in August.

Contractor is working on storm sewer instillation and grading. Construction on the bridge is anticipated to start the week of April 30th.  

All dates are tentative and subject to weather delays

Please see the detour map below

Contact Us

  1. Engineering & Public Works


    City Administration Building
    3600 86th Street
    Urbandale, IA 50322
    Directions

    Phone: 515-278-3950
    Email

    Hours 

    (Except Holidays)
    Monday - Friday
    8 a.m. - 5 p.m.

    Staff Directory